The wood burning stove has been installed.
First put some scaffold up and remove a few roof tiles.
Cut a large hole in the wood fibre sarking board and insert the flue (encased in a fireproof insulating sleeve) Here shown after the first row of tiles have been replaced:
And here with the flashing and the rest of the tiles replaced
On the inside there is a large hole in the ceiling to ensure anything flamable is 6cm or more from the flue
A cover plate tidies it up
The pipe runs down and through the floor
And in the room below, down to the stove
And the test run