Stove and flue instalation

The wood burning stove has been installed.

First put some scaffold up and remove a few roof tiles.

flue_scaffold

Cut a large hole in the wood fibre sarking board and insert the flue (encased in a fireproof insulating sleeve)  Here shown after the first row of tiles have been replaced:

flue_pipe_1

And here with the flashing and the rest of the tiles replaced

flue_pipe_2

On the inside there is a large hole in the ceiling to ensure anything flamable is 6cm or more from the flue

flue_pipe_3

A cover plate tidies it up

flue_pipe_4

The pipe runs down and through the floor

flue_pipe_6

And in the room below, down to the stove

flue_pipe_7

And the test run

stove

 

 

 

Previous Entries Heating and hot water Next Entries Living room finished