We actually finished this in the summer but forgot to post the blog entry.
Yet another job this year that took longer than it should, not least because my Multipanel wall panels were held hostage in the builders merchant for 12 weeks during the summer 2020 lockdown meaning I could not progress at all.
It started with the floor tiling, a job I had done by the local tiler. This is another wet room like the bathroom using an Impey tray former and tanking system.
The walls were all covered in Multipanel
I built a made to measure vanity unit to house the WC cistern and a counter top basin, as well as providing storage shelving.
This is the last room to be finished meaning all the rooms of the house are essentially complete.