Main living room / kitchen No category June 12, 2018 The main living room / kitchen downstairs is taking shape. First the cabling, some pipework, and the sound insulation in... Read more »
The “Electrical” cupboard No category May 5, 2018 No, not the distribution board, but the cupboard under the stairs where all the electrical things that make the house... Read more »
Main bathroom complete No category March 30, 2018 The main bathroom has now been completed. All the walls in wet areas are done with a waterproof wall board... Read more »
Bathroom (wet room) floor No category March 4, 2018 The main bathroom is being done as a wet room. Firstly lay the flooring, with a wet room shower former... Read more »
The stairs are in No category December 3, 2017 The staircase is now installed. The stairs came from Stairbox.com being significantly cheaper than any local joiner could make them... Read more »
Plastering, Upstairs No category November 5, 2017 Following on from getting the upstairs of the house plasterboarded, it has now all been skimmed with plaster. Next step,... Read more »
Plasterboarding upstairs No category September 12, 2017 The bulk of the upstairs has now been plasterboarded. That’s the bedrooms, landing and stairwell. 79 sheets of plasterboard so... Read more »
MVHR ducting No category June 7, 2017 One of the features of our new house is we are fitting MVHR (mechanical ventilation with heat recovery) to help... Read more »
Air tightness detail upstairs No category May 30, 2017 I have now completed fitting the air tightness membrane upstairs, taping and fitting the service void battens. Before I could... Read more »
Airtightness detail No category April 27, 2017 The latest installment of this build is detailing the airtightness, one of the fratures that should make it a low... Read more »